fahim iqbal
About Candidate
Location
Education
Surveying Diploma
Work & Experience
I work with Neom Sharma NRC- 09 Neom Residence Community Construction village. Construction work, Road work, Infrastructure and steel structure excavation Backfilling lean concrete foundation all kinds of survey work. Guiding surveying team preparing all kinds of work for surveyors, preparing road profile calculation of asphalt and backfilling quantities, conducting cross-sections of profiles and preparing data for electrical work and telecom work, firefighting, and making profiles for parking. Conduct relocation subdivision cadastral survey, preparing and computing elements of curve, and topographic data.
Working with National Water Company (NWC) Supervision team National water company Project Riydah to Alquwiyaha Preparing leveling sheets, cross-section, traverse survey Topographic survey. Excavation and backfilling. Walkway underground water tank soak pit manhole MEP work and review drawing with design team
National Water Company Project delivery of desalinated water to governorates Musrslat, Alfahya, Marooj, An-naval, Al-musaf, At Taiwan, Al-ghadir king fasial responsibility to delivered getting data to the site, catch basin, manhole, valve chamber, air release chambers making concrete quantity and road work with road asphalt quantity.Preparing all kinds of inspection paperwork.
Assistant Supervision surveying teamwork. Development infrastructure JIC cooling tower plant with supervision by BECHTEL housing scheme with 5km road work and lifting substation and 2 Energy transmission stations with 24 joint box work 1.5 km irrigation 1.5 km sanitary water collection and Conveyance system. Preparing all kind of papers work for inspection.
Site development project under the supervision of Royal Commission and BECHTEL Jubal Industrial College K.S.They developed around 1500 villas and delivered all site layouts of all utilities. Building foundation, roads, open drainage channel, electrical work substation energy transmission station lighting pool telecom system od duct bank telecom network I schematic diagram for telephone line and fire alarm systems. Preparing all kinds of data for inspection.
Al-Khobar housing development projects under the supervision of EMAAR. Its Layout of the lake, housing Scheme building, and road work delivered all kinds of work at the site road work, compute of earthwork computation, water ling storm line irrigation line sewer line electrical work with energy transmission telecom work CCTV camera and firefighting line conduct cross-section and profile for road and lake.
Site development Project under Royal Commission RC developed around 2500 villas 10km road work with water pipeline irrigation line sewer line with collection and conveyance system. Delivered power distribution cable street lighting pool and substation point and data. Delivered 2km open drainage channel as per site condition of designed details.
housing Development scheme DHA phase 2 under the supervision of AL-GHURAIE GIGA delivered the layout of the foundation of the tower giving beam levels conduct cross section and delivered pilling coordinates and level. Level foundation and roof. preparing inspection paperwork.
Road work and building work, irrigation work Water pipeline work. All kinds of survey work setting out, layout worker house. Plant extension backfilling excavation. Delivered all kinds of work under supervision.